TEMA: A new job remodeling a Stug

A new job remodeling a Stug 4 años 3 semanas antes #63739

  • Edwin
  • Avatar de Edwin Autor del tema
  • Fuera de línea
  • Teniente
  • Teniente
  • Edwin
  • Mensajes: 355
  • Gracias recibidas: 27
Hello,

I build again in a Stug on behalf of all the technology and to developing this conversion also exactly the right speaker, a use for battery and electronics and a tube rocker with side direction of servo operation.

The Bassis for the conversion I have already contacted me. A Stug with metal hull.



I started with the construction of the speaker. At the weekend I was with my printer on the Experts' in Mainz, where I ever designed and printed the first prototype.



To such a seemingly simple components in a tub fit perfectly You usually need three to four prototypes, but then it sits.
The second version fits much better but still not perfect.





Therefore, the third version of the Box is currently running on my printer and now it could fit after I have now also takes into account a recess for the transmission of the pipe evolation.

Por favor, Identificarse o Crear cuenta para unirse a la conversación.

A new job remodeling a Stug 4 años 3 semanas antes #63743

  • pacomerlo
  • Avatar de pacomerlo
  • Fuera de línea
  • Teniente General
  • Teniente General
  • "Trompudo"en movimiento.DBHMSSE 1:16 reorganizado
  • Mensajes: 1541
  • Gracias recibidas: 113
Edwin ... friend, you're the fucking one men, away few galaxies in knowledge and tools .. Do you want to marry me? :kiss: :kiss: ;)


Saludos y suerte.

El departamento I+D+I Cerrado hasta nueva orden
EL DBHMSSE 1:6 organizado y preparado para lo que venga
Pantherturm/operativa. VLA/operativo. E-100/operativo. Köenigtiger/de baja temporal. Ferdinand/operativo.
El DBHMSSE 1:16 reorganizándose 1 Panzer III 1 Panzer IV 1 Jagdpanther 6 Tiger

Por favor, Identificarse o Crear cuenta para unirse a la conversación.

El departamento I+D+I Cerrado hasta nueva orden
EL DBHMSSE 1:6 organizado y preparado para lo que venga
Pantherturm/operativa. VLA/operativo. E-100/operativo. Köenigtiger/de baja temporal. Ferdinand/operativo.
El DBHMSSE 1:16 reorganizándose 1 Panzer III 1 Panzer IV 1 Jagdpanther 6 Tiger

A new job remodeling a Stug 4 años 2 semanas antes #63753

  • Edwin
  • Avatar de Edwin Autor del tema
  • Fuera de línea
  • Teniente
  • Teniente
  • Edwin
  • Mensajes: 355
  • Gracias recibidas: 27
Hi Pacomerlo,

that one can achieve a great deal with their own ideas and hard work you show but already ... :silly:

Also I learn from you and your work ..... :woohoo:

Cheers, Edwin

Por favor, Identificarse o Crear cuenta para unirse a la conversación.

A new job remodeling a Stug 4 años 2 semanas antes #63754

  • Edwin
  • Avatar de Edwin Autor del tema
  • Fuera de línea
  • Teniente
  • Teniente
  • Edwin
  • Mensajes: 355
  • Gracias recibidas: 27
Overnight, the first prototype with recess for a central battery is now created.



But this is still buggy and even so I'm still not satisfied.

By the way, I started with the production of parts for the suspension and the same for multiple tanks.





Por favor, Identificarse o Crear cuenta para unirse a la conversación.

A new job remodeling a Stug 4 años 2 semanas antes #63816

  • Edwin
  • Avatar de Edwin Autor del tema
  • Fuera de línea
  • Teniente
  • Teniente
  • Edwin
  • Mensajes: 355
  • Gracias recibidas: 27
Somehow me very little time is currently allowed to do something, but a little bit it goes on.

The construction of loudspeakers and electronics box below vorran.



So you get very close indeed, but a battery with this great speaker under.
However, for this model, I'm still a speaker without these recesses which then has a little more volume.

Until all the parts that I need to arrive with me but I have ever started to disassemble the tub.



And I've still managed all attachable spoon that I had started last time ready to mill.





Por favor, Identificarse o Crear cuenta para unirse a la conversación.

A new job remodeling a Stug 4 años 2 semanas antes #63839

  • Edwin
  • Avatar de Edwin Autor del tema
  • Fuera de línea
  • Teniente
  • Teniente
  • Edwin
  • Mensajes: 355
  • Gracias recibidas: 27
This morning was now the final speaker, as I will install it finished.



I only had to remove a few supporting Struck doors.



And so now the parts fit into the tub.



To prepare the suspension, I have expanded the two strips with the retainers of the axes one by one, re-attached the holes to 3.1 mm Broken Drills and in the tub.





To find out the exact length of the axes, I simply use a wooden skewer, I cut until it fits snugly.



After this presentation, I could Cut the 12 steel rods for the axles and grind at the solder joint.



Nch degreasing I stretch the spoon holder in pairs in a vice and put one of each solder into the hole. The holders are then heated from below with a fine flame until the solder melts down on its own.



Then I warm the ground side of a steel rod and melt some tin on. I put this then with a twisting motion slowly into the hole while I the holder with a small flame Warm. Thus, the tin is pushed out slightly and the two parts perfectly connected.





Por favor, Identificarse o Crear cuenta para unirse a la conversación.

A new job remodeling a Stug 4 años 2 semanas antes #63895

  • Edwin
  • Avatar de Edwin Autor del tema
  • Fuera de línea
  • Teniente
  • Teniente
  • Edwin
  • Mensajes: 355
  • Gracias recibidas: 27
Feathers, feathers, feathers,

If I do that, then more equal, and so it still the same issue which for a E25, two tigers and a panther to do so.

The springs I wrap my little lathe to a 3mm steel rod.









The whole I'm doing with a hand crank machine is switched off.





Next, I have the same yet drilled the collars to fit the springs.





Third, I started with the improvement of the chain tensioner. To this end, I have to replace the fixing of plastic through metal.



That's why I shoot a brace of aluminum which simultaneously stiffens the hull.











The sides of the hull I drill on both sides on 9mm and glue the strut to the hull one.





And the chain tensioner are back in place, but much more stable.

Por favor, Identificarse o Crear cuenta para unirse a la conversación.

A new job remodeling a Stug 4 años 1 semana antes #63989

  • Edwin
  • Avatar de Edwin Autor del tema
  • Fuera de línea
  • Teniente
  • Teniente
  • Edwin
  • Mensajes: 355
  • Gracias recibidas: 27
Currently I am unfortunately again busy with many things, you do not need, but still it goes a little further.

Slowly, the suspension is complete.



For this operates flawlessly and is well adjusted I still have to assemble a lever. For this I use pieces of 10 x 10mm aluminum profile. In this I drill two holes and cut each one in this thread M3.



For installation, I think its angle fixed in proper position and makiere the holes on the tank bottom.
These posts are then provided with a center punch and drill. At the bottom of I then sink to the bottom. So I have a later almost smooth floor.









Then I makiere the places where I put the springs through the angle. Granulation again and drill.





So I can then mount angle by angle.





In order for the suspension without the expansion of the transmission is set I have to make in the gear plate two cutouts.
This I draw on and separate them with small cutting discs.







And so I can now adjust suspension ever.





At the end of today I was able to prepare the gear for installation of brushless motors.

Por favor, Identificarse o Crear cuenta para unirse a la conversación.

A new job remodeling a Stug 4 años 4 días antes #64094

  • Edwin
  • Avatar de Edwin Autor del tema
  • Fuera de línea
  • Teniente
  • Teniente
  • Edwin
  • Mensajes: 355
  • Gracias recibidas: 27
For the speaker and the electronics I have now printed the final version.



Next I do with the gears, the first time take place to see the attachment and Platzverhätnisse.



Each gear I mount with only two screws and around these also to be able to just clip on the plate I have to make a new hole in one of the two and all file it out a bit.





So I can then clean hull mounted in the side by side.



The inertia I saw on a pole and turn this match.







After a try I still have to drill the mounting screws and so I can screw it to the motors.







Last, they are still balanced and can now be mounted as in the transmission.

Por favor, Identificarse o Crear cuenta para unirse a la conversación.

A new job remodeling a Stug 4 años 2 días antes #64129

  • Edwin
  • Avatar de Edwin Autor del tema
  • Fuera de línea
  • Teniente
  • Teniente
  • Edwin
  • Mensajes: 355
  • Gracias recibidas: 27
To be able to mount the gear ready I had to unscrew the holes in the pinion to 3.17 mm shaft diameter. The drilling works not so well through the transverse bore of the clamping and runs like.



And so I can now combine gears and motors.



Since inertia is something I must project beyond the transmission tilted code that into the Hull. The easiest way with a 3mm pad that I splicing with the mounting plate.





Shoring The axis I'm very easy again with epoxy putty and ball bearings under the countershaft covers.

[img]http://up.picr.de/18958537hx.jpg [/ img] [img]http://up.picr.de/18958538yv.jpg

The gearbox itself, of course, get a cover after I have it well lubricated. I had to adjust a little while. In each tank is different, but I think as the now looks quite acceptable.





Even the mounted control and sprockets and raised the chain.





So it goes in great steps to the first test drive, but previously been programmed the controller.



So I could move the Stug now today in a first test drive at 34 ° C in the shade on the grass, by the way .... without any heat problem with all parts.





A few settings are still necessary, but it runs quite acceptable.

Por favor, Identificarse o Crear cuenta para unirse a la conversación.

A new job remodeling a Stug 4 años 2 días antes #64134

  • pacomerlo
  • Avatar de pacomerlo
  • Fuera de línea
  • Teniente General
  • Teniente General
  • "Trompudo"en movimiento.DBHMSSE 1:16 reorganizado
  • Mensajes: 1541
  • Gracias recibidas: 113
Brother, once again a perfect job, congratulations.


Saludos y suerte.

El departamento I+D+I Cerrado hasta nueva orden
EL DBHMSSE 1:6 organizado y preparado para lo que venga
Pantherturm/operativa. VLA/operativo. E-100/operativo. Köenigtiger/de baja temporal. Ferdinand/operativo.
El DBHMSSE 1:16 reorganizándose 1 Panzer III 1 Panzer IV 1 Jagdpanther 6 Tiger

Por favor, Identificarse o Crear cuenta para unirse a la conversación.

El departamento I+D+I Cerrado hasta nueva orden
EL DBHMSSE 1:6 organizado y preparado para lo que venga
Pantherturm/operativa. VLA/operativo. E-100/operativo. Köenigtiger/de baja temporal. Ferdinand/operativo.
El DBHMSSE 1:16 reorganizándose 1 Panzer III 1 Panzer IV 1 Jagdpanther 6 Tiger

A new job remodeling a Stug 4 años 2 días antes #64139

  • Miguel
  • Avatar de Miguel
  • Fuera de línea
  • Moderador de 1ª Clase
  • Moderador de 1ª Clase
  • Mensajes: 4246
  • Gracias recibidas: 362
¿No es demasiada inercia, Edwin?
Como siempre un estupendo trabajo.

Not too much inertia, Edwin?
As always a great job.
;)

2 Tiger I - 2 T34/85 - Panther G - KV1 - Stug III G - Sherman M4A1

Dice mi mujer que como puede dar tanto de si un tanque...

Por favor, Identificarse o Crear cuenta para unirse a la conversación.

2 Tiger I - 2 T34/85 - Panther G - KV1 - Stug III G - Sherman M4A1

Dice mi mujer que como puede dar tanto de si un tanque...
Última Edición: por Miguel.

A new job remodeling a Stug 4 años 1 día antes #64149

  • Edwin
  • Avatar de Edwin Autor del tema
  • Fuera de línea
  • Teniente
  • Teniente
  • Edwin
  • Mensajes: 355
  • Gracias recibidas: 27
Hi Miguel,

when I look at videos of originals is the inertia just right. He must not roll out a while if a tank with the equivalent of 40 km / h runs.

regards Edwin

Por favor, Identificarse o Crear cuenta para unirse a la conversación.

A new job remodeling a Stug 4 años 1 hora antes #64164

Werkstatt und Neid, dass Talent, ich liebe, wie Ihre Tanks, :woohoo: herzlichen Glückwunsch für Ihre Arbeit unterwegs.

Grüße


Que envidia de taller y de talento, me encanta como se mueven los tanques :woohoo: , enhorabuena por tus trabajos.

Saludos

Emisoras FS-TH9X y FS-GT3B
Sherman M4A1 Matotoys, Tiger I, Jagdpanther, Panzer IV, T-34/85 y M41A3 Walker Buldog de HL
Renault FT-17 y Pegaso 3046 en proceso
Seat 600 D Solido, camion Scania Bruder y gondola modificados RC.... y otros proyectos si Dios y la crisis quiere.

Por favor, Identificarse o Crear cuenta para unirse a la conversación.

Emisoras FS-TH9X y FS-GT3B
Sherman M4A1 Matotoys, Tiger I, Jagdpanther, Panzer IV, T-34/85 y M41A3 Walker Buldog de HL
Renault FT-17 y Pegaso 3046 en proceso
Seat 600 D Solido, camion Scania Bruder y gondola modificados RC.... y otros proyectos si Dios y la crisis quiere.

A new job remodeling a Stug 3 años 11 meses antes #64185

  • Edwin
  • Avatar de Edwin Autor del tema
  • Fuera de línea
  • Teniente
  • Teniente
  • Edwin
  • Mensajes: 355
  • Gracias recibidas: 27
And on it goes.

Now I have to construct a new cannon rocker with side direction of servo operation.

For this purpose, but one must first remove the cannon and that is something Trickie.

First one makes the front of the Karlotte the cover carefully. Among them are 2 screws one turn out.



Then you have at the bottom of the inside release a third screw and unscrew the cradle bearings from the roof. Then you can pull out the gun forward and screw the recoil from.





During this time, the first prototype on the printer was ever done.



But this is still a bit too long and does not fit properly.



Why I have not printed a second version fits much better







On the gun barrel I have ever stuck a brass tube as an extension lead.



Today I will then also a little concern myself more with the side straightening. I can then install separately from the Evolation.

Por favor, Identificarse o Crear cuenta para unirse a la conversación.